Product Overview
iGantt
Create detailed, activity-based mine schedules, including trucking
Model drill, blast, load/haul and backfill activities
Allocate mining blocks to shovels using simple point-and-click controls
Verify the practicality and value of schedules with 3D animation
Generate custom reports for physicals, equipment, consumables and budget financials
Provide management with schedule costing and streamline procurement.
Specifications
Interactive Gantt charts
Set precedences between activities and allocate resources to activities, giving you the flexibility to view and filter activities based on resources, location or processes.
Detailed rate modelling
Allows you to allocate different resource assignments over the duration of an activity.
Equipment scheduling with custom calendars
Maintain a detailed production schedule and consider different mining rates, scheduled maintenance and work crew availability.
3D visual scheduling
Use a simple point-and-click function using strings, filled/outlined polygons and triangulated solids to sequence activities on a resource.
Custom reporting
Create dynamic custom reports with advanced attribute and resource conditions as you schedule or export reports as a csv.
Schedule animations
Validate the practicality of your schedule and share your schedule with stakeholders without access to iGantt.
ODBC interface
Connect iGantt to a multi-users production database. As reserves are updated, your schedule can be easily updated.
Auto-generated precedences
Automatically generate logical mining precedences that follow the geometry of your operation.
Underground auto-scheduling module (UG and UG Optimizer editions only)
Create a balanced production schedule by automatically adjusting heading development rates and achieve maximum equipment utilization at all times.
Constraint-based optimization (UG Optimizer edition only)
Develop an optimal schedule which simultaneously balances mining rate, controls milling rate and mill feed blend with minimum and maximum levels. Eliminate the tedium of hitting targets in production scheduling.